Step 1: Evaluate the current network,  operations, and network management infrastructure
a. Use word processing software to create a  Project Plan Checklist document based on this lab.
b. From the case study, document, identify,  and assess the current state of the following factors:
- Physical facilities: Pada kapasitas / peluang  untuk tumbuh
- Environmental facilities: Pada kapasitas /  peluang untuk tumbuh
- Electrical facilities: Pada kapasitas /  peluang untuk tumbuh
For each factor, indicate whether it is at  capacity or has scope for growth. Include these factors on the checklist  with your assessment.
c. Assess  the ability of the current operations and network management  infrastructure to support a new technology solution. On the checklist,  list the following categories and include what changes must be completed  before the implementation of any new technology solution.
- Infrastructure
- Personnel
- Processes
- Tools
d. Identify and add to the checklist any  custom applications that may be required for the new network.
Step 2:  Outline the project plan
a. To manage the project, the project plan  includes five components. List these five components and an example of  each, and then add them to the checklist.
1) Tasks· (Install wireless Access Points,  mengkonfigurasikan  router)
2) Timelines and critical milestones·  (kalender atau chart)
3) Risks and constraints· (Temporary loss of  services, budget)
4) Responsibilities· (alokasi tugas)
5) Resources required: (pengkabelan,  perlengkapan, waktu, keterampilan khhusus)
b. The plan needs to be within the scope,  cost, and resource limits established by the business goals.
List any potential issues that the  FilmCompany may have to consider to meet these goals, and then add them  to the checklist.
Sumber dana untuk membiayai proyek.
Apa yang dapat dicapai dalam batas waktu  yang ada?
c. The FilmCompany and the stadium management  need to assign staff to manage the project from each of their  perspectives. List the desirable skills and knowledge that these  individuals should possess, and then add them to the checklist.
Keterampilan komunikasi yang baik
Keterampilan organisasi dan perencanaan  yang baik
Pengetahuan layanan jaringan yang up to date
Pengetahuan dan keterampilan teknis  jaringan sekarang
d. Save your Project Plan Checklist document.  You will use it during the next stages of this network design case  study.
Step 3: Reflection
Sometimes apparent urgency, pressure to  present results, and enthusiasm for a project can create a work  environment that causes projects to be started before proper planning  has been completed.
Consider and  discuss the potential problems that result from starting a network  upgrade before completely assessing the existing network.
Peralatan baru yang mungkin tidak  kompatibel dengan peralatan yang ada.
Infrastruktur jaringan yang ada mungkin dapat  menjalankan layanan baru.
Peralatan baru yang tidak perlu bisa dibeli.
Hilangnya layanan jaringan mungkin  terjadi ketika upgrade berlangsung.
Waktu dan anggaran keuangan  dapat melebihi batas.
 
 