Step 1:  Identify the areas that will be used for designing a strategy that  facilitates availability
a.  Use word processing software to create a new document called  “Availability Strategies.”
b.  Use the identified constraints that set limits or boundaries on the  network upgrade project and the
potential trade-offs to assist in brainstorming ideas with  other students.
The  strategy should cover the following areas:
Availability strategies  for switches:
- • Redundant power supplies and modules
- • Hot-swappable cards and controllers
- • Redundant links
- • UPS and generator power
Availability  strategies for routers:
- • Redundant power supplies, UPS, and generator power
- • Redundant devices
- • Redundant links
- • Out-of-band management
- • Fast converging routing protocols
Availability  strategies for Internet/Enterprise Edge:
- • Dual ISP providers or dual connectivity to a single provider
- • Co-located servers
- • Secondary DNS servers
Step 2: Create  availability strategies for switches
a. Using the list developed from the brainstorming session,  create a list of equipment that will be
incorporated into the availability strategy.
The FilmCompany network equipment  includes:
2 x 1841 Routers  (FC-CPE-1, FC-CPE-2)
3 x 2960  Switches (FC-ASW-1, FC-ASW-2, ProductionSW)
Several servers
1 x Linksys WRT300N Wireless Router  (FC-AP)
1 x ADSL Modem for  Internet Access
b. Using  the list of equipment, identify modules and redundant power supplies  that will increase
availability  for the switches.
c.  Identify potential hot swappable cards and controllers that can be used.  Create a list that identifies
each with cost and features.
d. Develop a diagram that shows potential redundant links  that can be incorporated into the network
design.
e.  Identify at least two possible UPS devices that can be incorporated into  the design. Create a list that
identifies the cost and features of each.
f. Save your Availability Strategies  document.
Step 3: Create availability strategies for routers
a. Use word processing software to  create an addition to the Availability Strategies document.
b. Using the list of equipment,  identify redundant power supplies that will increase availability for  the
switches.
c. Identify potential redundant  devices and links that can be used. Create a list that identifies each  with
cost and features.
d. Create a diagram that displays  the redundant connections.
e.  Develop a list of potential routing protocols that will facilitate fast  convergence times.
f. Save  your Availability Strategies document.
Step 4: Create availability strategies for  Internet/Enterprise Edge
a.  Use word processing software to create an addition to the Availability  Strategies document.
b.  Identify options available that would allow for dual ISP or dual  connectivity to a single provider.
c. Create a design that will co-locate the servers to allow  for redundancy and ease of maintenance.
d. Save your Availability Strategies document.
Step 5: Reflection
The creation of availability  strategies poses many challenges for the designer. What were a few of  the more difficult challenges you encountered?
Consider and discuss the identified  strategies. Do all of the strategies designed accomplish the task the  same way?
Would one be less  expensive or less time-consuming than the other?
• Berbagai modul dapat dibeli dengan berbagai fitur dan biaya.
• Berbagai perangkat UPS dapat dibeli dengan berbagai fitur dan biaya.
• Beberapa protokol routing dapat dipilih, tetapi mana yang paling sesuai desain?
• Berbagai perangkat UPS dapat dibeli dengan berbagai fitur dan biaya.
• Beberapa protokol routing dapat dipilih, tetapi mana yang paling sesuai desain?
 
 
Tidak ada komentar:
Posting Komentar