Step 1: Determine the tasks to implement the  network design
Implementing a network design requires the  completion of a set of tasks, such as installing hardware,
configuring systems, testing the network, and  launching the network into production. Each task consists of several  steps.
Each task  requires the following documentation:
- A description of the task
- References to design documents
- Detailed implementation guidelines
- Detailed rollback guidelines in case of  failure
- The estimated time required for  implementation
- Completion sign-off
Analyze the FilmCompany network design  documentation that you have compiled in previous labs. Determine and  list the three main sets of tasks required to be performed to implement  the network upgrade. These sets of tasks will be referred to as phases.
Phase 1
_______ Install Distribution and  Core Layer equipment
_______ Configure new IP addressing & VLAN scheme
_______ Configure routing
Phase 2
_______ Upgrade the WAN  connectivity
_______ Extend the network to the remote site
_______ Configure ACLs &  security
Phase 3
_______ Install wireless/mobility  network
Step 2: Note identified success and  failure criteria
When implementing a design, the possibility  of a failure must be considered – even after a successful pilot or  prototype network test. Each step of the implementation may require  additional testing to ensure that the network operates as designed.
In the Reflection section in Chapter 2, Lab  2.3.3, you considered success criteria when determining the
objectives of the FilmCompany network  upgrade. List two or three success or failure criteria for each phase of  the project.
Phase 1
_______
_______
_______
Phase 2
_______
_______
_______
Phase 3
_______
_______
_______
Step 3: Include provision for customer  approval
The Implementation Plan details the work  required to accomplish the project goals. The plan includes the
customer expectations and the success  criteria for customer approval and project sign-off. As soon as customer  approval of the implementation plan is obtained, the installation can  begin. The customer is given a detailed list of all devices required and  the work to be completed. This list forms part of the Implementation  Plan. A signed copy of this list is kept by the network designer and  account manager.
Upon  completion of each task, the customer is required to sign off that the  work was completed and that the results are as expected.
a. Include in the documentation a signature  page for an authorized FilmCompany representative to sign
and approve the Implementation Plan.
b. Include in the documentation a signature  page at the end of each task for an authorized
FilmCompany representative to sign and accept  the completion of each task.
Step 4: Document Phase 1
Step 5: Document Phase 2
 
 